Search This Blog

Friday, March 25, 2016

Checking In


Tax time and spring yard work has taken priority over fun time in the garage, so nothing of importance is happening with the Plymouth. I did get most of the flower beds cleaned and tilled, and today I have to order 12 yards of hardwood mulch to finish them. With my bad back, that part of the job will take several days to complete, as shovels and wheelbarrows do a real number on it. I hate when real work interferes with fun work!

The lighter weight sheet metal I ordered arrived a few days ago, so I can get started on the console structure and AC ducts once I get my tax info to the preparer, and the mulch spread.

After that is done, I think the next project will be determining a location for the terminal strips and interior fuse block so I can begin running wire from the back of the car. The firewall is quickly running out of accessible space, so maybe I can fit them in below the armrest storage bin.

No comments:

Post a Comment